Topped Out!

  • Writer: James O'Callaghan
    James O'Callaghan
  • Oct 28, 2018
  • 1 min read

The team from DMR ‘Topped Out’ the steel this week, all lined and levelled and ready for the timber framing to start. They have done a great job and have acted in a very professional manner throughout the steel frame erection. In fact they have done such an efficient job that I am regretting not having made the remaining upper level out of steel rather than the timber that it is planned to be. Hindsight is a painful teacher someti

Steel frame topped out, complete, Fairhaven steel frame, slender columns
Island Rest Steel Frame Complete

mes..

 
 
 